07414 860 800info@moultonbrickwork.co.ukMon – Fri: 07.30 – 17.00
Get a quote

Setting Out and Groundwork

Setting Out and Groundwork — illustration

Service overview

Foundations, oversite and setting out straight from the drawings.

Setting out is the cheapest thing on site and the most expensive thing to get wrong. We take the levels, establish the datum, profile the plot and gauge the rods before anything is dug.

We can take on the footings and oversite too, so the trade that lays the brickwork is the trade that set the level it starts from.

Plan and details

Levels and datum established

Taken from a fixed point, recorded, and left on site.

Profiles and gauge rods

Set before the dig, so the first course is right.

Foundations and oversite

Dug, poured and blinded to the engineer's detail.

One trade, one accountability

Whoever set the level lays the brick off it.

Got drawings and a start date?

Send your drawings, photographs and project location so we can discuss the scope and next steps.

Request a quote
Call 07414 860 800Request a quote